Dans cette rubrique
Working methods
1st phase
A tour of your facility,
Exploration of your environment: goals, needs, constraints.
Feasibility study and pre-study of resources:
Analysis of resources,
Recommendation of resources,
Backward planning,
Quote.
Working methods
2nd phase
·
Detailed study:
Detailed study of resources,
Presentation of drawings for validation,
Study of detailed drawings, validation
Working methods
4th phase
Delivery, installation and production startup:
Delivery,
Installation,
Production test,
Final validation,
Delivery report.
Working methods
3rd phase
Optimisation or resources and machining:
Startup of machining, metalwork, automatic control systems, etc.
Assembly,
Fine-tuning,
Pre-validation before delivery,
FAT
IDI Pharma
Menu principal
Homepage
IDI Pharma
Human resources
Organisation chart
Material resources
Working methods
References
Services
Made-to-measure products
Research and development
Products
Equipment range
Traceability range
Performance range
Ease range
Ecological range
Cleaning range
Customized range
Newsletter
Contact
Location
Homepage
Français
English
Pied de page
Legal
Site map
Site created by DeclicWeb